Lafarge Cement Factory, France
The Lafarge cement plant faced significant structural challenges, including corrosion of previous additional prestressing, development of large cracks, and deterioration of reinforcing bars in the main silo wall. To reduce stress, silo filling capacity was limited to 75%.
Solutions Delivered:
- Removal of existing strengthening post-tensioning and cover mortar
- Surface preparation and patching
- Installation of additional external post-tensioning using the 1X15® system
