Repair work was needed to address moisture that was entering the structure through the cable system at roof penetrations. The main purpose of this project was to protect the cables with an elastomeric cable wrap system that would eliminate the water protrusion into the building and increase the longevity of the cable system.
With the help of rope access specialists, 2,000 LF of cable was wrapped by hand, and a wireless humidity monitoring system was installed by Freyssinet to determine the performance of the wrap. Additionally, new cable bands and maintenance of the anchors for the cable system were completed by Freyssinet on an as-needed basis.
Another main component of the David L. Lawrence Convention Center project was the support masts for the steel cables and the fabric roof; the masts were fully recoated using a 3-part painting. After the painting of the masts was completed (without any damage to the fabric roof), Freyssinet replaced the lightning protection at the top of the flagpoles.