Project Reference: Tunnel Repair Without Traffic Disruption
Solutions provided:
- Void injection with cementitious grout (3,900 cubic yards)
- Water ingress treatment using resin injection (over 20,000 injection points)
- Concrete defect repair with wet-sprayed mortar (18,300 square feet)
- Cleaning of tunnel linings, trackbeds, and drainage systems